Socket Cross
Dongfang
Availability: | |
---|---|
6). Non-standard: We can produce according to the drawing and requirement.
Product | socket welding cross forged pipe fittings |
Material | ASTM A105N,ASTM A182(F304L,F316L) |
Contact type | Socket welding |
Dimension Specification | ASME B16.11-2016(Revision of ASME B16.11-2011) |
Pressure | 3000lb, 6000lb, 9000lb |
Temperature | -20°C to +600°C |
Place of origin | Yancheng, China |
Package | Wooden case with cartons |
Application | Petroleum, gas, chemical,metallurgy, construction |
Advantage | High quality, good price, faster delivery time, available in all sizes,customized |
Delivery | By sea, By air and By express |
Lead time | According to the quantities and specifications of each order; Normal delivery times is from 25 to 35 days after receiving the deposit. |
6). Non-standard: We can produce according to the drawing and requirement.
Product | socket welding cross forged pipe fittings |
Material | ASTM A105N,ASTM A182(F304L,F316L) |
Contact type | Socket welding |
Dimension Specification | ASME B16.11-2016(Revision of ASME B16.11-2011) |
Pressure | 3000lb, 6000lb, 9000lb |
Temperature | -20°C to +600°C |
Place of origin | Yancheng, China |
Package | Wooden case with cartons |
Application | Petroleum, gas, chemical,metallurgy, construction |
Advantage | High quality, good price, faster delivery time, available in all sizes,customized |
Delivery | By sea, By air and By express |
Lead time | According to the quantities and specifications of each order; Normal delivery times is from 25 to 35 days after receiving the deposit. |